1. Home
  2. Answers
  3. How long does a bathroom remodel take?

Answer · Full remodel

How long does a bathroom remodel take?

Most full bathroom remodels in Phoenix take 10–15 working days once work starts. A tub-to-shower conversion takes 3–5 days, a walk-in shower 4–6, and a large primary bathroom with layout changes 3–4 weeks. Custom glass, special-order materials and permit inspections are what usually stretch a schedule, so get yours in writing.

By the Desert Skies Contracting team · Updated September 27, 2026 · Phoenix metro, AZ

Typical timelines by project

These are working days on site, counted from demo day. Design, ordering and permit approval happen before that and are not included.

ProjectTime on sitePrice range
Vanity and tile refresh2–4 days$4,500–$12,000
Tub-to-shower conversion3–5 days$7,900–$16,500
Walk-in shower remodel4–6 days$9,800–$24,000
Full bathroom remodel10–15 days$18,500–$60,000
Primary bathroom with layout changes3–4 weeks$32,000–$95,000

What happens in a full remodel, in order

  1. Demo and protection. Floors covered, dust barriers up, old bathroom out.
  2. Rough plumbing and electrical. New valve, drain and wiring go in while the walls are open. If a permit applies, the inspector looks at it before anything is covered.
  3. Backer board and waterproofing. The shower is waterproofed and the pan is flood-tested before tile.
  4. Tile. Usually the longest single step. Thinset and grout need cure time that cannot be rushed.
  5. Vanity, counters, toilet, fixtures, lighting.
  6. Paint, trim and glass. Custom glass is measured after the tile is finished, so it is often the last thing installed.

What makes a Phoenix remodel run long

  • Slab work. Valley homes sit on concrete slabs. Moving a drain means cutting concrete, and on a post-tension slab the cables have to be located first.
  • Inspections. Each inspection has to be scheduled with the city. A well-planned job lines them up with the build, but a failed or missed inspection costs a day or more.
  • Special-order materials. Tile, vanities and glass with long lead times should be on site before demo, not ordered after.
  • Surprises in the wall. Old leaks, damaged framing or worn drain lines in older homes have to be fixed before the job moves on.
  • Changes after the start. Swapping tile or moving a fixture mid-job resets the schedule.

How to keep yours on schedule

Pick every finish before demo day. Ask the contractor to confirm materials are in hand and the permit is issued before they tear anything out. Ask for a written day-by-day schedule and who your contact is when something slips. We give that schedule before we start, and the price does not change when the calendar does.

Key facts

Full bathroom remodel
10–15 working days
Walk-in shower
4–6 days
Primary bathroom with layout changes
3–4 weeks
Full remodel price range
$18,500–$60,000

Where we do this work

Instant estimate

Your price range in sixty seconds.

Six taps, no phone call. You get a real range built from our packages, then Desert Skies texts it to you with two consult times.

  1. Which bathroom
  2. What you want
  3. Tile or acrylic
  4. Glass
  5. Size
  6. ZIP

A range, not a quote: the exact price still comes in writing after the free visit.

Next step

Now get the number for your bathroom.

Free in-home consultation + exact price in 48 hours. One fixed price in writing. No surprises. Most showers done in 5 days.

Request your free consultation

Four quick details. We text you to set a time that suits you.

We work across the Phoenix metro.

For the confirmation text.

  1. We text you to set a time that suits you (Mon–Sat 7am–7pm)
  2. Free in-home visit we measure and go through the options with you
  3. One written price within 48 hours of the visit
  • Licensed contractor, ROC #345756
  • Bonded and insured
  • Warranty on all labor
  • One fixed price in writing

Quick facts

Business
Desert Skies Contracting — bathroom remodeling, serving Phoenix Metro, Arizona
Phone
(602) 557-6888
Email
karson@desertskiescontracting.com
Service area
Phoenix Metro, Arizona, 36 cities
Hours
Mon–Sat 7am–7pm
License
ROC #345756
Warranty
Warranty on all labor · Fixed price in writing · Licensed, bonded, insured · Daily cleanup, dust barriers
Price ranges
Full Bathroom Remodel $18,500–$60,000, 10–15 days · Walk-In Shower Remodel $9,800–$24,000, 4–6 days · Tub-to-Shower Conversion $7,900–$16,500, 3–5 days · Master Bathroom Remodel $32,000–$95,000, 3–4 weeks · Vanity, Tile & Refresh $4,500–$12,000, 2–4 days · Accessible & Aging-in-Place Bath $9,500–$28,000, 4–7 days
Consultation
Free in-home design consultation; exact fixed price in writing within 48 hours. Contact
Profiles
Yelp
Call Free consultation