1. Home
  2. Answers
  3. What waterproofing should be behind shower tile?

Answer · Walk-in shower

What waterproofing should be behind shower tile?

A tiled shower needs a continuous waterproof membrane behind or directly under the tile, covering the walls, the pan and the drain connection. That means a bonded sheet membrane, a liquid-applied membrane or waterproof foam board with sealed seams. Tile, grout and cement board are not waterproof on their own. The pan should be flood-tested before tile.

By the Desert Skies Contracting team · Updated September 27, 2026 · Phoenix metro, AZ

Tile is not the waterproofing

Water gets through grout. It always has. Tile and grout are the wear surface, and what keeps the wall dry is the layer behind them. Cement board does not fall apart when wet, but water passes through it, so it still needs a membrane. Regular drywall and moisture-resistant green board do not belong in a shower at all.

The systems that work

SystemWhat it isWatch for
Bonded sheet membraneWaterproof sheet set over the backer, with a matching drain. Schluter Kerdi is the best-known brandSeams must overlap and be fully bonded
Liquid-applied membraneRolled or troweled on in coats over cement boardMust reach the thickness the manufacturer requires; thin coats fail
Waterproof foam boardThe board itself is waterproofEvery seam and screw has to be sealed
Traditional liner and mortar bedLiner under a sloped mortar floorLiner must sit on a slope, not flat. Not suited to curbless showers

We use a bonded sheet system, Schluter or equal. Whatever the system, all parts should come from one manufacturer and be installed by its instructions. Mixing products is how warranties get voided.

Where showers actually leak

  • The drain connection
  • Inside corners and where the walls meet the pan
  • Niches and benches
  • The curb, especially where screws go through the top
  • Around the valve and shower head openings

All of these are details, not big surfaces. A good installer spends most of the waterproofing time on them.

The flood test

Before tile, the drain is plugged and the pan is filled with water, then left for about 24 hours. If the level holds, the pan is tight. It costs a day and catches the one mistake that would otherwise mean tearing out a finished shower. Some cities inspect the pan or membrane on permitted jobs, so check with yours.

Questions to ask your contractor

  1. Which waterproofing system, by name?
  2. Does it cover the walls to full height, or only the pan?
  3. Do you flood-test, and can I see it?
  4. Are corners and changes of plane sealed with flexible sealant, not grout?

Phoenix homes sit on slabs, so a leak shows up as damaged walls and baseboards next to the shower, often long after the job is paid for. Waterproofing is included in every shower we build, from $7,900 conversions to $24,000 walk-in showers.

Key facts

Required layer
Continuous waterproof membrane
Not waterproof alone
Tile, grout, cement board
Test before tile
Flood test, about 24 hours
Most common leak points
Drain, corners, niches, curb

Where we do this work

Instant estimate

Your price range in sixty seconds.

Six taps, no phone call. You get a real range built from our packages, then Desert Skies texts it to you with two consult times.

  1. Which bathroom
  2. What you want
  3. Tile or acrylic
  4. Glass
  5. Size
  6. ZIP

A range, not a quote: the exact price still comes in writing after the free visit.

Next step

Now get the number for your bathroom.

Free in-home consultation + exact price in 48 hours. One fixed price in writing. No surprises. Most showers done in 5 days.

Request your free consultation

Four quick details. We text you to set a time that suits you.

We work across the Phoenix metro.

For the confirmation text.

  1. We text you to set a time that suits you (Mon–Sat 7am–7pm)
  2. Free in-home visit we measure and go through the options with you
  3. One written price within 48 hours of the visit
  • Licensed contractor, ROC #345756
  • Bonded and insured
  • Warranty on all labor
  • One fixed price in writing

Quick facts

Business
Desert Skies Contracting — bathroom remodeling, serving Phoenix Metro, Arizona
Phone
(602) 557-6888
Email
karson@desertskiescontracting.com
Service area
Phoenix Metro, Arizona, 36 cities
Hours
Mon–Sat 7am–7pm
License
ROC #345756
Warranty
Warranty on all labor · Fixed price in writing · Licensed, bonded, insured · Daily cleanup, dust barriers
Price ranges
Full Bathroom Remodel $18,500–$60,000, 10–15 days · Walk-In Shower Remodel $9,800–$24,000, 4–6 days · Tub-to-Shower Conversion $7,900–$16,500, 3–5 days · Master Bathroom Remodel $32,000–$95,000, 3–4 weeks · Vanity, Tile & Refresh $4,500–$12,000, 2–4 days · Accessible & Aging-in-Place Bath $9,500–$28,000, 4–7 days
Consultation
Free in-home design consultation; exact fixed price in writing within 48 hours. Contact
Profiles
Yelp
Call Free consultation