Full Bathroom Remodel in Fountain Hills, AZ
We redo the whole room at once: the shower or tub, the vanity, the floor, the lighting and the fan, with one crew. In Fountain Hills it usually costs $19K–$60K and takes 10–15 days on site.
- Licensed contractorROC #345756
- Bonded and insuredFor your home and ours
- Labor warrantyOn all labor, in writing
- Fixed priceIn writing within 48 hours
- Free consultationIn your home
Design concept.
- Home
- Fountain Hills
- Full Bathroom Remodel
Fountain Hills, AZ · 10–15 days on site · $19K–$60K
What a full bathroom remodel in Fountain Hills involves.
We redo the whole room at once: the shower or tub, the vanity, the floor, the lighting and the fan, with one crew. In Fountain Hills it usually costs $19K–$60K and takes 10–15 days on site. The visit is free, and you get one fixed price in writing within 48 hours.
You are in the right place if
- The whole room feels dated, not just the shower
- You want the shower, vanity, floor, lighting and fan done at once, by one crew
- You want one written price for all of it
Request your free consultation
Four quick details. We text you to set a time that suits you.
Pick your package
Three ways to build it in Fountain Hills. One exact price.
Start from the package closest to what you want. The estimator turns it into your range in sixty seconds; the free visit turns it into one written number.
10 days on site · fixed price in writing
- Demo & haul-away
- Porcelain tile floor
- Acrylic or ceramic-tile shower or tub surround
- Stock vanity with quartz top
- New toilet, faucet, mirror
- LED lighting & quiet exhaust fan
- Paint & trim
12 days on site · fixed price in writing
- Everything in Good
- Large-format porcelain floor & shower walls
- Custom tiled shower with fixed glass panel
- Semi-custom vanity, quartz, undermount sinks
- Comfort-height toilet & new valve
- Decorative lighting, dimmers, heated towel bar
- Plumbing & electrical updates to code
15 days on site · fixed price in writing
- Everything in Better
- Layout change (move a wall or fixture)
- Frameless glass, niche & bench
- Heated tile floor
- Custom vanity & floating mirrors
- Freestanding tub or oversized shower
- Smart fan, lighting & controls
Prices are typical for a standard-size bathroom across the Phoenix metro. Size, glass and layout changes move the number; the estimator shows you how.
What decides your price
Two Fountain Hills full bathroom remodels rarely cost the same.
- Whether the layout changes or stays
- How much floor and wall gets tiled, and with what
- The vanity size and the counter material
- Lighting, outlets and the exhaust fan
- Moving plumbing, a wall or a window
At the free visit we measure, go through each of these with you, and the written price says what you chose.
Fountain Hills homes
What a full bathroom remodel in Fountain Hills usually involves.
Set on ridges east of the McDowell Mountains, Fountain Hills is mostly single-family homes and condos built from the 1970s onward.
Hillside lots and lower levels
Some Fountain Hills houses step down their lots, with bedrooms and a bathroom on a lower level. A bathroom over a framed floor or against a retaining wall has different drain and waterproofing needs than one on a plain slab. Getting materials in can also involve stairs and steep driveways.
Scale on doors and dark tile
Hard water marks every unsealed surface in a shower. In Fountain Hills homes it shows most on framed glass doors, where deposits collect in the metal track, and on dark tile. Frameless panels with no bottom track, lighter porcelain and a handheld sprayer for rinsing the walls reduce the cleaning.
Where we work in Fountain Hills
- Eagle Mountain Eagle Mountain is a gated golf community with homes mostly from the 1990s and 2000s.
- FireRock FireRock is a gated country club community of custom and semi-custom homes, built mainly from the 2000s on.
- SunRidge Canyon SunRidge Canyon grew up around its golf course in the 1990s.
Building permits from the Town of Fountain Hills. Fountain Hills is a Maricopa County town with its own government, and permits come from the town's own development services staff, not from the county or a neighboring city.
Instant estimate
Your price range in sixty seconds.
Six taps, no phone call. You get a real range built from our packages for Fountain Hills, then Desert Skies texts it to you with two consult times.
- Which bathroom
- What you want
- Tile or acrylic
- Glass
- Size
- ZIP
A range, not a quote: the exact price still comes in writing after the free visit.
What is included
A full remodel in Fountain Hills, written down.
Every item below is in your fixed Fountain Hills price, along with dust protection and daily cleanup, and the warranty on all labor.
- Demo & haul-away
- Plumbing & electrical updates
- Tile floors and walls
- Custom shower or tub
- Vanity, counters, mirrors
- Lighting & ventilation
- Paint & trim
Usual Fountain Hills price
Your exact number within 48 hours of the visit.
Time on site
A written schedule before work starts.
The schedule
How the 10–15 days go.
Consultation and exact price
We walk your bathroom, measure it, and go through tile, glass and fixture options with you. You get one fixed number within 48 hours.
Protect and demo
Dust barriers up, floors covered, old tub or shower out by lunch. Plumbing rough-in the same afternoon.
Waterproof and set
Schluter-class waterproofing, pan and curb (or curbless slope), niche and bench framed. City inspection before anything is covered, where the permit requires it.
Tile and finish
Large-format porcelain or stone, laser-level layout, grout that is sealed against Arizona hard water.
Glass, fixtures, handoff
Frameless glass measured on day 2 goes in. Rain head, handheld, lighting. We clean, walk you through, and hand you the warranty.
How it goes in Fountain Hills
From the first visit to the finished room.
01 · The visitOne written proposal, line by line
We measure the room, listen to what you want, and go through the proposal with you: what is included, the schedule and one fixed price. The visit is free.
02 · Day oneThe house is protected first
Floors are covered and a dust wall goes up before anything comes out, and the crew cleans up every day. You have the schedule in writing before work starts.
03 · HandoverWe walk the finished room with you
Every fixture is run with you in the room, and you get the warranty on all labor in writing. The final price is the written price.
Illustrations of a typical project, not photos of our crew or our customers.
Design ideas for Fountain Hills homes
What yours could look like.
Design concepts. Photos of finished projects are added after each handoff.



Fountain Hills questions
Straight answers.
What does a full bathroom remodel cost in Fountain Hills?
Usually $19K–$60K in Fountain Hills. The size of the room, the tile, the glass and any plumbing that moves make the difference. After a free in-home visit you get one fixed price in writing within 48 hours, with the warranty on all labor.
How long does it take?
Plan on 10–15 days on site. You get the schedule in writing with the price, before work starts.
Do condos in Fountain Hills allow bathroom remodels?
Generally yes, with the association's consent. Condominium documents usually let owners renovate inside the unit but require notice or approval when plumbing, walls or floors are involved, because those connect to other units. Drain locations tend to be fixed. Tub-to-shower changes, new tile, vanities and lighting are all realistic within those bounds.
What makes a bathroom safer for an older homeowner in Fountain Hills?
A shower without a high step does the most. After that come a bench or fold-down seat, grab bars anchored into solid blocking, slip-resistant floor tile, lever handles, a taller toilet and good lighting including a night light. A valve that limits water temperature prevents scalding. These can all be built in so the room looks like an ordinary well-designed bathroom.
Is the room usable while a full remodel is underway?
No, the room is out of service from demolition until fixtures are set. The toilet is usually the last item removed and among the first reinstalled where scheduling allows, but the shower cannot be used until tile, grout and sealant have cured. Households with a single bathroom should plan for another place to shower during the work.
What happens if damage is found behind the walls?
It gets repaired before anything new covers it. Common finds are water-stained studs near the old valve, deteriorated drain fittings and missing insulation. The contractor should show the problem, explain the repair and put any added cost in writing before proceeding. Closing a wall over rot or a leaking joint only moves the failure a few years down the road.
Do you work in Eagle Mountain, FireRock, and SunRidge Canyon?
Yes. We work across Fountain Hills, including Eagle Mountain, FireRock, and SunRidge Canyon, ZIP codes 85268.
Full Bathroom Remodel in Fountain Hills, AZ, by Desert Skies Contracting: $18,500–$60,000, 10–15 days on site, one fixed price in writing. We serve all of Fountain Hills, including Eagle Mountain, FireRock, and SunRidge Canyon, and ZIP codes 85268, and we are licensed under ROC #345756. Book a free in-home design consultation; your exact price arrives within 48 hours. Call (602) 557-6888.
Questions people ask
What homeowners ask in Fountain Hills.
One page per question, written by Desert Skies and kept current. See every answer
Fountain Hills
Free in-home consultation + exact price in 48 hours
One fixed price in writing. No surprises. Most showers done in 5 days.
Call (602) 557-6888↗More in Fountain Hills
Quick facts
- Business
- Desert Skies Contracting — bathroom remodeling in Fountain Hills, Arizona
- Phone
- (602) 557-6888
- Service area
- Fountain Hills (Maricopa County): Eagle Mountain, FireRock, SunRidge Canyon. ZIP codes 85268. Nearby: Rio Verde, North Scottsdale, Leisure World, Mesa
- Hours
- Mon–Sat 7am–7pm
- License
- ROC #345756
- Price range
- Full Bathroom Remodel $18,500–$60,000, 10–15 days
- Consultation
- Free in-home design consultation; exact fixed price in writing within 48 hours. Contact
- Profiles
- Yelp
