Master Bathroom Remodel in Biltmore, AZ
We plan and rebuild the primary bath around how you use it: a bigger shower, a freestanding tub, a double vanity. In Biltmore it usually costs $32K–$95K and takes 3–4 weeks on site.
- Licensed contractorROC #345756
- Bonded and insuredFor your home and ours
- Labor warrantyOn all labor, in writing
- Fixed priceIn writing within 48 hours
- Free consultationIn your home
Design concept.
Biltmore, AZ · 3–4 weeks on site · $32K–$95K
What a primary bathroom remodel in Biltmore involves.
We plan and rebuild the primary bath around how you use it: a bigger shower, a freestanding tub, a double vanity. In Biltmore it usually costs $32K–$95K and takes 3–4 weeks on site. The visit is free, and you get one fixed price in writing within 48 hours.
You are in the right place if
- You want the primary bath to feel like a retreat
- You are weighing a bigger shower, a freestanding tub or a double vanity
- You want a plan and a fixed price before anything starts
Request your free consultation
Four quick details. We text you to set a time that suits you.
Pick your package
Three ways to build it in Biltmore. One exact price.
Start from the package closest to what you want. The estimator turns it into your range in sixty seconds; the free visit turns it into one written number.
15 days on site · fixed price in writing
- Design consultation
- Demo & haul-away
- Porcelain tile floors & shower
- Fixed-glass shower
- Semi-custom double vanity, quartz
- New toilet, lighting, fan
- Paint & trim
18 days on site · fixed price in writing
- Everything in Good
- Freestanding soaking tub
- Oversized shower with frameless glass, niche & bench
- Heated tile floor
- Custom double vanity & lighting
- Layout tweak (one fixture moves)
- Permits & engineering
22 days on site · fixed price in writing
- Everything in Better
- Layout change with wall moves
- Steam shower with body sprays
- Natural stone or slab walls
- Smart mirrors, controls & towel warmers
- Water closet with bidet seat
- Wet-room build option
Prices are typical for a standard-size bathroom across the Phoenix metro. Size, glass and layout changes move the number; the estimator shows you how.
What decides your price
Two Biltmore primary bathroom remodels rarely cost the same.
- The layout: a tub and a shower, or one large shower
- The size of the room and any walls that move
- Natural stone or porcelain
- Frameless glass and the shower fixtures
- The vanity length, counter and lighting
At the free visit we measure, go through each of these with you, and the written price says what you chose.
Biltmore homes
What a primary bathroom remodel in Biltmore usually involves.
The Biltmore area of Phoenix combines golf course estates with a large number of gated condos, townhomes and patio homes.
Fiberglass units and cultured marble
Patio home builders of the 1970s, 1980s and 1990s used one-piece fiberglass tub and shower units and cultured marble tops. They yellow, crack at the corners and cannot be patched invisibly. Cutting out the unit and tiling the alcove gives a roomier shower in the same space and allows a lower threshold.
Common walls, stacked drain lines
Townhomes and condos near the Biltmore share walls, and in multi-story buildings the drains and vents serve units above and below. Moving a toilet or shower drain is seldom practical. Sound also travels, so insulation in the plumbing wall and a quiet exhaust fan are worth adding while the walls are open.
Where we work in Biltmore
- Biltmore Estates These are the detached custom homes on the streets that loop around the golf courses.
- Biltmore Greens A gated community of patio homes along the fairways, mostly single level.
- Piestewa Peak Homes near the peak and the Phoenix Mountains Preserve include mid-century ranch houses, hillside customs and townhomes.
Phoenix permits and Biltmore association rules. The Biltmore is not a municipality.
Instant estimate
Your price range in sixty seconds.
Six taps, no phone call. You get a real range built from our packages for Biltmore, then Desert Skies texts it to you with two consult times.
- Which bathroom
- What you want
- Tile or acrylic
- Glass
- Size
- ZIP
A range, not a quote: the exact price still comes in writing after the free visit.
What is included
A master bath in Biltmore, written down.
Every item below is in your fixed Biltmore price, along with dust protection and daily cleanup, and the warranty on all labor.
- Design consultation
- Layout changes & walls
- Freestanding soaking tub
- Oversized spa shower with steam option
- Heated tile floors
- Custom double vanity & lighting
- Smart mirrors & controls
Usual Biltmore price
Your exact number within 48 hours of the visit.
Time on site
A written schedule before work starts.
The schedule
How the 3–4 weeks go.
Consultation and exact price
We walk your bathroom, measure it, and go through tile, glass and fixture options with you. You get one fixed number within 48 hours.
Protect and demo
Dust barriers up, floors covered, old tub or shower out by lunch. Plumbing rough-in the same afternoon.
Waterproof and set
Schluter-class waterproofing, pan and curb (or curbless slope), niche and bench framed. City inspection before anything is covered, where the permit requires it.
Tile and finish
Large-format porcelain or stone, laser-level layout, grout that is sealed against Arizona hard water.
Glass, fixtures, handoff
Frameless glass measured on day 2 goes in. Rain head, handheld, lighting. We clean, walk you through, and hand you the warranty.
How it goes in Biltmore
From the first visit to the finished room.
01 · The visitOne written proposal, line by line
We measure the room, listen to what you want, and go through the proposal with you: what is included, the schedule and one fixed price. The visit is free.
02 · Day oneThe house is protected first
Floors are covered and a dust wall goes up before anything comes out, and the crew cleans up every day. You have the schedule in writing before work starts.
03 · HandoverWe walk the finished room with you
Every fixture is run with you in the room, and you get the warranty on all labor in writing. The final price is the written price.
Illustrations of a typical project, not photos of our crew or our customers.
Design ideas for Biltmore homes
What yours could look like.
Design concepts. Photos of finished projects are added after each handoff.



Biltmore questions
Straight answers.
What does a master bathroom remodel cost in Biltmore?
Usually $32K–$95K in Biltmore. The size of the room, the tile, the glass and any plumbing that moves make the difference. After a free in-home visit you get one fixed price in writing within 48 hours, with the warranty on all labor.
How long does it take?
Plan on 3–4 weeks on site. You get the schedule in writing with the price, before work starts.
Can a tub be replaced with a walk-in shower in a Biltmore patio home?
Yes, this works well in patio homes. The shower is built in the tub's alcove using the existing drain location, with the drain line upsized for a shower. On a ground-floor slab the curb can be kept low. A glass panel in place of a curtain or sliding door opens the room visually, and a bench and niche fit along the long wall.
What can change in a Biltmore townhome bathroom if the plumbing has to stay put?
Almost everything you see and touch. With drains fixed, the tub or shower, tile, vanity, counters, mirrors, lighting, fan and door can all be replaced, and the shower valve can be raised and updated within the same wall. A wider vanity, a recessed medicine cabinet and a pocket door add storage and floor area without touching a drain.
Can a garden tub be replaced with a bigger shower?
Yes. Many Valley tract homes built in the 1990s and 2000s have a decked garden tub beside a small shower stall. Both are removed, and the combined area becomes one generous shower or a shower with a slimmer tub next to it. Drain relocation in the slab is usually involved, so the plumbing route is worked out early in design.
What is a wet room?
A wet room places the shower and the tub together inside one waterproofed, glass-enclosed zone. The whole floor of that zone slopes to a drain, so splashes from the tub are contained. It saves space compared with separate fixtures and gives a generous shower. It requires more membrane, careful slope planning and good ventilation because a larger area gets wet daily.
Do you work in Biltmore Estates, Biltmore Greens, and Piestewa Peak?
Yes. We work across Biltmore, including Biltmore Estates, Biltmore Greens, and Piestewa Peak, ZIP codes 85016.
Master Bathroom Remodel in Biltmore, AZ, by Desert Skies Contracting: $32,000–$95,000, 3–4 weeks on site, one fixed price in writing. We serve all of Biltmore, including Biltmore Estates, Biltmore Greens, and Piestewa Peak, and ZIP codes 85016, and we are licensed under ROC #345756. Book a free in-home design consultation; your exact price arrives within 48 hours. Call (602) 557-6888.
Questions people ask
What homeowners ask in Biltmore.
One page per question, written by Desert Skies and kept current. See every answer
Biltmore
Free in-home consultation + exact price in 48 hours
One fixed price in writing. No surprises. Most showers done in 5 days.
Call (602) 557-6888↗Quick facts
- Business
- Desert Skies Contracting — bathroom remodeling in Biltmore, Arizona
- Phone
- (602) 557-6888
- Service area
- Biltmore (Maricopa County): Biltmore Estates, Biltmore Greens, Piestewa Peak. ZIP codes 85016. Nearby: Arcadia, Paradise Valley, Phoenix, Scottsdale
- Hours
- Mon–Sat 7am–7pm
- License
- ROC #345756
- Price range
- Master Bathroom Remodel $32,000–$95,000, 3–4 weeks
- Consultation
- Free in-home design consultation; exact fixed price in writing within 48 hours. Contact
- Profiles
- Yelp