Master Bathroom Remodel in Chandler, AZ

We plan and rebuild the primary bath around how you use it: a bigger shower, a freestanding tub, a double vanity. In Chandler it usually costs $32K–$95K and takes 3–4 weeks on site.

  • Licensed contractorROC #345756
  • Bonded and insuredFor your home and ours
  • Labor warrantyOn all labor, in writing
  • Fixed priceIn writing within 48 hours
  • Free consultationIn your home

Design concept.

  1. Home
  2. Chandler
  3. Master Bathroom Remodel

Chandler, AZ · 3–4 weeks on site · $32K–$95K

What a primary bathroom remodel in Chandler involves.

We plan and rebuild the primary bath around how you use it: a bigger shower, a freestanding tub, a double vanity. In Chandler it usually costs $32K–$95K and takes 3–4 weeks on site. The visit is free, and you get one fixed price in writing within 48 hours.

You are in the right place if

  • You want the primary bath to feel like a retreat
  • You are weighing a bigger shower, a freestanding tub or a double vanity
  • You want a plan and a fixed price before anything starts

Request your free consultation

Four quick details. We text you to set a time that suits you.

We work across the Phoenix metro.

For the confirmation text.

  1. We text you to set a time that suits you (Mon–Sat 7am–7pm)
  2. Free in-home visit we measure and go through the options with you
  3. One written price within 48 hours of the visit
  • Licensed contractor, ROC #345756
  • Bonded and insured
  • Warranty on all labor
  • One fixed price in writing

Pick your package

Three ways to build it in Chandler. One exact price.

Start from the package closest to what you want. The estimator turns it into your range in sixty seconds; the free visit turns it into one written number.

Good
$32,000

15 days on site · fixed price in writing

  • Design consultation
  • Demo & haul-away
  • Porcelain tile floors & shower
  • Fixed-glass shower
  • Semi-custom double vanity, quartz
  • New toilet, lighting, fan
  • Paint & trim
BetterMost chosen
$48,000

18 days on site · fixed price in writing

  • Everything in Good
  • Freestanding soaking tub
  • Oversized shower with frameless glass, niche & bench
  • Heated tile floor
  • Custom double vanity & lighting
  • Layout tweak (one fixture moves)
  • Permits & engineering
Best
$69,000

22 days on site · fixed price in writing

  • Everything in Better
  • Layout change with wall moves
  • Steam shower with body sprays
  • Natural stone or slab walls
  • Smart mirrors, controls & towel warmers
  • Water closet with bidet seat
  • Wet-room build option

Prices are typical for a standard-size bathroom across the Phoenix metro. Size, glass and layout changes move the number; the estimator shows you how.

What decides your price

Two Chandler primary bathroom remodels rarely cost the same.

  • The layout: a tub and a shower, or one large shower
  • The size of the room and any walls that move
  • Natural stone or porcelain
  • Frameless glass and the shower fixtures
  • The vanity length, counter and lighting

At the free visit we measure, go through each of these with you, and the written price says what you chose.

Chandler homes

What a primary bathroom remodel in Chandler usually involves.

Three generations of housing sit inside Chandler: mid-century houses near the old downtown square, tract neighborhoods from the 1980s and 1990s across the middle of the city, and newer lake communities to the south.

Cast iron tubs near downtown

Older Chandler houses close to the historic square often still have their first cast iron tub. These tubs are heavy and durable, and some owners keep and refinish them. When the goal is a walk-in shower, the tub is broken up or carried out whole, and the old drain and trap get replaced along with it.

Oversized tub decks in south Chandler

In the lake and golf communities of south Chandler, primary baths were designed around a large built-in tub, often under a window or a glass block panel. The shower beside it is usually a modest corner stall. Shifting that balance toward a bigger shower is the change owners of these homes ask about most.

Where we work in Chandler

  • Ocotillo A master-planned community in south Chandler, built mostly in the 1990s and 2000s along a network of lakes and golf holes.
  • Fulton Ranch A 2000s community in south Chandler with lakes, gated sections and upscale production and semi-custom homes.
  • Sun Groves A 2000s tract neighborhood in southeast Chandler with family-sized one and two-story homes.
  • Downtown Chandler The blocks around the historic square hold some of the city's oldest houses, many with one or two small bathrooms.

Who issues permits in Chandler. Chandler is an incorporated city, so residential permits go through the City of Chandler and not Maricopa County.

Instant estimate

Your price range in sixty seconds.

Six taps, no phone call. You get a real range built from our packages for Chandler, then Desert Skies texts it to you with two consult times.

  1. Which bathroom
  2. What you want
  3. Tile or acrylic
  4. Glass
  5. Size
  6. ZIP

A range, not a quote: the exact price still comes in writing after the free visit.

What is included

A master bath in Chandler, written down.

Every item below is in your fixed Chandler price, along with dust protection and daily cleanup, and the warranty on all labor.

  • Design consultation
  • Layout changes & walls
  • Freestanding soaking tub
  • Oversized spa shower with steam option
  • Heated tile floors
  • Custom double vanity & lighting
  • Smart mirrors & controls

Usual Chandler price

$32K–$95K

Your exact number within 48 hours of the visit.

Time on site

3–4 weeks

A written schedule before work starts.

The schedule

How the 3–4 weeks go.

Day 0

Consultation and exact price

We walk your bathroom, measure it, and go through tile, glass and fixture options with you. You get one fixed number within 48 hours.

Day 1

Protect and demo

Dust barriers up, floors covered, old tub or shower out by lunch. Plumbing rough-in the same afternoon.

Day 2

Waterproof and set

Schluter-class waterproofing, pan and curb (or curbless slope), niche and bench framed. City inspection before anything is covered, where the permit requires it.

Day 3–4

Tile and finish

Large-format porcelain or stone, laser-level layout, grout that is sealed against Arizona hard water.

Day 5

Glass, fixtures, handoff

Frameless glass measured on day 2 goes in. Rain head, handheld, lighting. We clean, walk you through, and hand you the warranty.

How it goes in Chandler

From the first visit to the finished room.

  1. The visit: one written proposal, line by line (illustration)
    01 · The visit

    One written proposal, line by line

    We measure the room, listen to what you want, and go through the proposal with you: what is included, the schedule and one fixed price. The visit is free.

  2. Day one: the house is protected first (illustration)
    02 · Day one

    The house is protected first

    Floors are covered and a dust wall goes up before anything comes out, and the crew cleans up every day. You have the schedule in writing before work starts.

  3. Handover: we walk the finished room with you (illustration)
    03 · Handover

    We walk the finished room with you

    Every fixture is run with you in the room, and you get the warranty on all labor in writing. The final price is the written price.

Illustrations of a typical project, not photos of our crew or our customers.

Design ideas for Chandler homes

What yours could look like.

Design concepts. Photos of finished projects are added after each handoff.

Master Bathroom Remodel design concept
Master bath
Master Bathroom Remodel detail
Detail
Master Bathroom Remodel finished
Concept

Chandler questions

Straight answers.

What does a master bathroom remodel cost in Chandler?

Usually $32K–$95K in Chandler. The size of the room, the tile, the glass and any plumbing that moves make the difference. After a free in-home visit you get one fixed price in writing within 48 hours, with the warranty on all labor.

How long does it take?

Plan on 3–4 weeks on site. You get the schedule in writing with the price, before work starts.

What do Ocotillo homeowners typically change in a primary bathroom?

The tub and shower arrangement is the usual starting point. Owners in Ocotillo often remove the built-in tub deck, enlarge the shower and add a bench and niche. Some place a smaller soaking tub in a corner of the old footprint. Vanities are commonly raised to a more comfortable height, and the private toilet room gets better lighting and a quieter fan.

Can an older downtown Chandler bathroom be made larger?

Sometimes, by borrowing space from a neighboring closet or hallway. Exterior walls in mid-century houses are hard to move, so expansion usually goes toward the interior. When the footprint has to stay, a walk-in shower behind a clear glass panel, a narrow vanity and a pocket door can make the same room work noticeably better and feel less cramped.

Can a garden tub be replaced with a bigger shower?

Yes. Many Valley tract homes built in the 1990s and 2000s have a decked garden tub beside a small shower stall. Both are removed, and the combined area becomes one generous shower or a shower with a slimmer tub next to it. Drain relocation in the slab is usually involved, so the plumbing route is worked out early in design.

What is a wet room?

A wet room places the shower and the tub together inside one waterproofed, glass-enclosed zone. The whole floor of that zone slopes to a drain, so splashes from the tub are contained. It saves space compared with separate fixtures and gives a generous shower. It requires more membrane, careful slope planning and good ventilation because a larger area gets wet daily.

Do you work in Ocotillo, Sun Groves, and Fulton Ranch?

Yes. We work across Chandler, including Ocotillo, Sun Groves, Fulton Ranch, and Downtown Chandler, ZIP codes 85224, 85225, 85226, 85248, 85249, and 85286.

Master Bathroom Remodel in Chandler, AZ, by Desert Skies Contracting: $32,000–$95,000, 3–4 weeks on site, one fixed price in writing. We serve all of Chandler, including Ocotillo, Sun Groves, Fulton Ranch, and Downtown Chandler, and ZIP codes 85224, 85225, 85226, 85248, 85249, and 85286, and we are licensed under ROC #345756. Book a free in-home design consultation; your exact price arrives within 48 hours. Call (602) 557-6888.

Chandler

Free in-home consultation + exact price in 48 hours

One fixed price in writing. No surprises. Most showers done in 5 days.

Call (602) 557-6888

Quick facts

Business
Desert Skies Contracting — bathroom remodeling in Chandler, Arizona
Phone
(602) 557-6888
Email
karson@desertskiescontracting.com
Service area
Chandler (Maricopa County): Ocotillo, Sun Groves, Fulton Ranch, Downtown Chandler. ZIP codes 85224, 85225, 85226, 85248, 85249, 85286. Nearby: Gilbert, Mesa, Tempe, Ahwatukee
Hours
Mon–Sat 7am–7pm
License
ROC #345756
Price range
Master Bathroom Remodel $32,000–$95,000, 3–4 weeks
Consultation
Free in-home design consultation; exact fixed price in writing within 48 hours. Contact
Profiles
Yelp
Call Free consultation